A-57.
Establish nationally standardized best-practice systems for irrigation
Ministry
Ministry of Water Resources And Meteorology
Category
Adaptation
Sector
Water resources
Action progress
Action Implementation Location
This action progress below has been implemented at:
National Level
National Level
Sub-national Level
Annual Data
Annual progress made recorded by the respective ministry.
Target 1 - regional exchange to countries that have globally recognized specialized irrigation and water resources experience
Unit measured in Number
Target 2 - nation-wide (35 river basins) soil assessment program for irrigation investment established
Unit measured in Number
Target 3 - national standard for design, construction and performance monitoring of irrigation schemes developed
Unit measured in Number
Target 4 - Establish 502 long-term O&M contracts for large irrigation schemes to set-up organizational, management, operational, financial and administration systems, including building PDWRAM and Farmer Water User Committee capabilities
Unit measured in Number
Target 5 - - Established small pilot trials (50 ha to 100 ha) to test cutting edge technology and advance irrigation practice, including testing water delivery systems, preparation measures, crop types and patterns, fertilizers, and potential scale up cost and benefits
Unit measured in Number
Target 6 - - Establish 544 Farmer Water User Committees
Unit measured in Number
Target 7 - large water storage infrastructures
Unit measured in Number
Target 8 - rehabilitated and new irrigation schemes with O&M plans
Unit measured in Number
Additional information
Action Details | Input | Description |
---|---|---|
Technology Availability | Yes | |
Technology Availability | Yes | |
Technology Availability | No | Manpower construction task |
Number of women/ % of women participation- participants for regional exchange | 0%/25% | |
Number of women/ % of women participation- farmer water user committees female | 0%/40% | |
Number of women/ % of women participation- participants for regional exchange | 0%/25% | |
Number of women/ % of women participation- farmer water user committees female | 0%/40% | |
Number of women/ % of women participation- participants for regional exchange | 60%/25% | Participations mainly women approximately between 60/ 70%. |
Number of women/ % of women participation- farmer water user committees female | 25%/40% | Support women participation at least 30%-35%, but in reality, a little lower number. |
Youth (engaged, not engaged, description) | No | |
Youth (engaged, not engaged, description) | No | |
Youth (engaged, not engaged, description) | No | Youth participated was little approximately 10/20%. |
Private sector (engaged, not engaget, description) | Yes | |
Private sector (engaged, not engaget, description) | Yes | |
Private sector (engaged, not engaget, description) | No | |
Capacity Support Needed |
|
|
Capacity Support Needed |
|
|
Capacity Support Needed |
|
|
SDGs |
|
Financing
Financial Costs (USD)
2,498,900$
No. | Budget | Financed By | Funding Details | Year |
---|---|---|---|---|
1405 | 0 |
Ministry of Economy and Finance
|
2022 | |
1406 | 0 |
Ministry of Economy and Finance
|
Continuous Monitoring and Technical Support to 145 Farmer Water User communities whole country | 2022 |
1407 | 18,000,000 |
Ministry of Economy and Finance
|
Water resources management and Conservation within O&M of 172 project of irrigation system in the whole country. The potential irrigated areas for rice about 127,754 hectares in dry season and 451,788hectares in wet season. | 2022 |
1408 | 30,000,000 |
Ministry of Economy and Finance
|
Rehabilitation 23 projects of water basin and canal for irrigated 28248 hectares in 14 provinces: 21619 hectares in wet season, 6629 hectares in dry season and in other 1218 hectares. Baseline 32 irrigation schemes Target 200 irrigation schemes by 2030 Yearly achievement 24 irrigation schemes Capacity Support Needed 1-Yearly implementation of irrigation schemes rehabilitation and construction around 25 schemes 2-Emergency rehabilitation in case of flood or drought 3-More reservoir storage building 4-Pounds excavation 5-Natural water way and lakes rehabilitation | 2022 |
1476 | 20,927,205 |
Ministry of Economy and Finance
|
86.000.000.000 riel for year 2023, , approximately USD 20,927,205 | 2023 |
1477 | 1,946,716 |
Ministry of Economy and Finance
|
8.000.000.000 riel for year 2023, approximately USD 1,946,716 -7,045,000,000 riel for Provincial Departments (PDWRAMs) implementation -555,000,000 riel for establishment for the FWUCs implementation by Department FWUC -400,000,000 Technical support and monitoring for the FWUCs implementation by Department FWUC | 2023 |
Action Budget Implementation Location
This budgets above has been implemented at: